HQ Plant: Jeedimetla, Hyderabad|
100% In-House Industrial Execution
PROJECTS & CASE STUDIES

Proven Execution. Visible Results.

From Concept To Installation • 100% In-House Plant Delivery

Showcase of SIJO INFOTECH's completed corporate branding, 3D LED signage, industrial UV printing, ACP elevation cladding, interior workplace graphics, digital displays, and turnkey architectural execution projects across India.

NABH COMPLIANT
Healthcare Elevation & Wayfinding

18ft 3D LED entrance board, emergency monolith pylons, and sanitizable glass backdrops.

[ DYNAMIC PROJECT INSTALLATION PREVIEW ]
1000+
Projects Completed
Across Commercial Sectors
13+
Years Experience
Industrial Manufacturing
500+
Corporate Clients
Empanelled Accounts
50+
Industries Served
Healthcare to Real Estate
Pan India
Turnkey Execution
Central Plant Delivery
100%
In-House Machinery
Zero Sub-Contracting
FLAGSHIP CASE STUDY

Detailed Execution Breakdown

Healthcare & Critical CareHyderabad, India

CareMax Super Speciality Hospital

Delivered Scope: 3D LED Entrance Signage, Monolith Wayfinding Pylons, Glass UV Backdrops, Safety Signs

✓ AFTER TRANSFORMATION & METRIC RESULT:

Patient navigation errors decreased by 50%, emergency vehicle response orientation improved dramatically, and the facility passed its NABH accreditation audit with zero signage non-conformities.

Project Objectives:
Deliver 100% NABH-compliant wayfinding and safety signage across 5 floors.
Manufacture high-visibility 3D LED main entrance boards legible from 300+ meters.
Execute site installation with zero dust or noise impact on ICU operations.
Engineering Solution Delivered:

SIJO INFOTECH deployed a complete turnkey visual solution manufactured entirely in-house at our Jeedimetla plant. We built a 18ft x 4ft front-lit 3D LED entrance board using Mitsubishi cast acrylic faces and IP67 Samsung LED modules on PVDF ACP cladding. Internal wayfinding was solved using sanitizable 10mm toughened glass UV-printed backdrops and modular lift lobby directories.

Execution Process Timeline:
STEP 01
Laser Site Audit

3D laser measurement of building facade anchor points and corridor illumination levels.

STEP 02
CAD & BOQ Approval

Detailed engineering vector drawings and transparent GST BOQ sign-off.

STEP 03
Off-Site Plant Manufacturing

SS letter bender routing, fiber laser micro-welding, and 72-hour LED burn-in testing at Jeedimetla.

STEP 04
Silent Overnight Erection

Off-hours site mounting using hydraulic boom lifts with zero daytime hospital disruption.

Approved Materials Used:
Jindal SS 304 Stainless SteelMitsubishi Cast Acrylic4mm PVDF ACPSamsung IP67 LEDsDow Corning Silicone
In-House Machinery Applied:
⚙️ Automatic Channel Letter Bender⚙️ Fiber Laser Welder⚙️ 10x7 UV Flatbed Printer⚙️ Heavy CNC Router Bed
[ REAL COMPLETED SITE PHOTO ]CAREMAX SUPER SPECIALITY HOSPITAL
Request Similar Site Survey
PLANT ASSET CONTRIBUTION

In-House Machinery Powering Project Execution

Explore Jeedimetla Machinery Floor →
🖨️

10x7 UV Flatbed Printer

Direct printing on glass, wood, acoustic felt, and SS machine tags with white ink backing.

⚙️

Heavy CNC Router Bed

Precision V-grooving of 4mm PVDF ACP sheets and intricate architectural jali pattern carving.

📐

CO₂ Laser Cutting Unit

Flame-polished edge cutting of Mitsubishi cast acrylic up to 20mm thickness.

🛠️

Automatic Channel Bender

Automated 3D return bending for Jindal SS 304/316 and aluminium channel letter rims.

Fiber Laser Micro-Welder

Seamless micro-welding of stainless steel letter faces with zero heat burn marks.

🎞️

Large Format Eco-Solvent

Continuous 10ft roll printing for outdoor billboards, fleet vinyl wraps, and backlit films.

SECTOR TRACK RECORD

Project Volume by Industry Vertical

🏥

Healthcare

180+ Projects

NABH Signage, Glass UV, Pylons

🏢

Corporate Offices

320+ Projects

SS Logo Walls, Frosted Decals, Video Walls

🛍️

Retail Chains & Malls

240+ Projects

ACP Elevations, 3D Store Channel Letters

⚙️

Industrial & Factories

150+ Projects

Gate Monoliths, ISO Safety Boards, SS Tags

🎓

Educational Institutions

75+ Projects

Campus Gateways, Floor Directories

🏨

Hospitality & Resorts

60+ Projects

Architectural Pylons, Brass Room Tags

🏛️

Government & Public

45+ Projects

Transit Signage, Reflective Road Pylons

RAW MATERIAL RIGOR

Certified Substrates Applied Across Projects

Jindal SS 304 / 316

3D Letter Rims, Mirror & Hairline Logo Backdrops, Machine Tags

4mm PVDF ACP

High-Rise Elevation Cladding, Pylon Monoliths, Store Canopy Fascia

Saint-Gobain Glass

Direct UV Partition Art, Standoff Reception Backdrops, Glazing

Mitsubishi Cast Acrylic

Front-Lit 3D Channel Letters, Push-Through Logos, Lightboxes

3M / Avery Vinyl

Frosted Glass Privacy Manifestations, Vehicle Wraps, Safety Boards

9mm PET Acoustic Felt

Boardroom Echo Reduction Panels, UV-Printed Culture Wall Art

Solid Brass & Titanium

Executive Room Door Tags, Heritage Feature Logos, Hotel Signage

Samsung IP67 LEDs

3D Letter Illumination, Halo Backlighting, Lightbox Modules

PROJECT WORKFLOW

9-Stage Enterprise Execution Framework

01

Requirement Audit

Day 1

Understanding brand guidelines, site dimensions, and statutory compliance needs.

02

Laser Site Survey

Day 1-2

3D laser measurement of structural anchor points, wind load, and illumination.

03

3D CAD Design

Day 2

CAD vector drawing preparation, material thickness callouts, and structural renders.

04

Client BOQ Approval

Day 2-3

Transparent itemized GST quote sign-off and material sample swatch sign-off.

05

Plant Manufacturing

Day 3-5

100% in-house CNC routing, fiber laser welding, UV printing, and channel bending.

06

ISO Quality Audit

Day 5

Lux consistency testing, powder coat adhesion checks, and bubble-pack protection.

07

Off-Hours Erection

Day 6

Certified rigging team installation during off-hours with zero business impact.

08

Final Handover

Day 6-7

Physical quality inspection, lux verification, and joint sign-off certificate.

09

SLA Support & AMC

Ongoing

3-year warranty documentation handover and structured AMC maintenance visits.

CLIENT REVIEWS

Feedback From Completed Projects

5.0 ★★★★★

"SIJO INFOTECH delivered our entire hospital 3D LED entrance and wayfinding directories in 6 days. Their in-house UV flatbed glass printing and off-site manufacturing ensured zero noise near our ICUs."

CareMax Super Speciality Hospital
General Manager - Infrastructure
5.0 ★★★★★

"Having 100% in-house machinery at Jeedimetla made all the difference. Their hairline rose gold stainless steel reception wall is the highlight of our executive floor during client visits."

TechNova Solutions HQ
Head of Corporate Facilities
5.0 ★★★★★

"For our manufacturing facility, SIJO delivered ISO-compliant safety boards and chemical-resistant SS machine tags. Their GST billing and engineering drawings were top-notch."

Precision Engineering Plant
Plant Operations Director
ISO 9001:2015
Quality Management Certified Plant
GSTIN: 36AMOPV7979B1Z8
100% Tax Compliant Legal Billing
UDYAM Registered
Government Recognized MSME Enterprise
Startup India Approved
Recognized Industrial Brand Innovator
PROJECT EXECUTION FAQ

15 Project Execution & Site Answers

Off-site manufacturing at our Jeedimetla plant takes 3 to 5 working days post CAD sign-off, followed by 1 to 3 days for site installation depending on structural complexity and wind-load rigging needs.
READY TO EXECUTE YOUR PROJECT WITH IN-HOUSE ASSETS?

Request a Site Laser Survey & 3D Concept Renders

Submit your architectural vector drawings or project brief for immediate engineering review and transparent GST pricing.

CallWhatsAppRequest BOQ